Details: k. additional civil and allied works external surface water drain excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5 m.) by mechanical means or directed by engineer incharge. external surface water drain construction of granular sub-base by providing close graded material conforming to specifications, mixing in a mechanical mix plant at omc, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and or directed by engineer incharg
Sector: District Administration