Details: demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in- charge. nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) providing and fixing trap of self cleansing design with down or hinged grating with or without vent arm complete, including cost of cuttingand making good the walls and floors upvc / vent / waste swr 100 mm inlet and 75 mm outlet. providing, laying and fixing p.v.c. pipe of 75mm dia. with fittings such as bends, tees, reducers, clamps, etc. including necessary excavation, trench filling etc. complete. including removing existing pipe line if necessary and conveying and stacking the same in mecl residence premises or as directed etc. complete. providing, laying and fixing p.v.c. pipe of 110 mm. dia. with fittings such as bends,tees, reducers, clamps, etc. including necessary excavation, trench filling etc. complete. including removing existing pipe line if necessary an
Sector: Mining