Details: dismantling of existing bg turnouts, diamond crossings and derailing switches with all types of rails and sleeper layout, removing rails, switches, crossings, sleepers & fastenings, leveling of ballast to correct profile & stacking all the released materials, sleepers, fastenings, rails, switches & crossings including segregating & stacking at specified locations in a neat and countable manner, within the lead of 250m & all lift, clear of infringements, crossing of track, if any complete, as directed - note: 1. this item shall be operated only when existing turnout is replaced either with new turnout in case of ttr or with plain track when existing turnout is no more required at that location. 2. rail cutting will be paid extra under relevant item. 3. laying of new turnout or plain track on prepared ballast bed, as required, shall be paid separately under relevant item. 1 in 8½ turnout. supply of permanent way materials 1st class for 60 kg rail section of standard size at site as per l
Sector: Food and Drugs