Details: dismantling brick masonry in mud and stacking the materials as directed with all leads, lifts etc. complete.removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete.removing cement or lime plaster including disposing of the spoils as directed with all leads, lifts etc, complete.removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. completeexcavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5 m.) filling in plinth and floors with contractors material/brought from outside and approved by engineer incharge in la
Sector: Remote Sensing and Geospatial