The SOUTH CENTRAL RLY has published a tender for "Nanded Division: Mudkhed- Pimpalkutti Section: Manufacturing, supply and stacking (50mm) of machine crushed Track Ballast conforming to RDSO Specification (IRS-GE-1) with latest correction slips at Railway depot at BHOKAR (BOKR ) or nominated location. at BHOKAR (BOKR ) Ballast depot and Loading Railway's ballast, collected at yard / depot into Railway's BOB / BKH / any other type of open wagon, using Mechanical Loader or any other method with all lead and lifts, as directed by Engineer in-charge . Under ADEN/NED's Jurisdiction for Completion Period 24 (Twenty four Months ) Including (03)Three months mobilization period)." on the 13 Oct 2025. This tender belongs to Track ballast category. This tender is published in Nanded, Maharashtra location. The vendors interested in this tender and related Track ballast tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: track ballast Tenders | transportation of sand Tenders | all types of transportation services Tenders
Related categories: Insulated rail joint Tenders | Track Ballast Spreading Tenders | Track Switch Tenders |
SCR issued 22 tenders for Track ballast last year
With, 3 floated just last month.
| Tender Title | Nanded Division: Mudkhed- Pimpalkutti Section: Manufacturing, supply and stacking (50mm) of machine crushed Track Ballast conforming to RDSO Specification (IRS-GE-1) with latest correction slips at Railway depot at BHOKAR (BOKR ) or nominated location. at BHOKAR (BOKR ) Ballast depot and Loading Railway's ballast, collected at yard / depot into Railway's BOB / BKH / any other type of open wagon, using Mechanical Loader or any other method with all lead and lifts, as directed by Engineer in-charge . Under ADEN/NED's Jurisdiction for Completion Period 24 (Twenty four Months ) Including (03)Three months mobilization period). |
|---|
| Published Date | |
|---|---|
| Due Date | 10 Nov 2025 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |