Details: preparation of detailed design and drawing including design notes for dam, waste weir/ gated spillwey, head regulator, lis component, canal structures etc and get vetted approved from the competent authorized consultant ( (cdo nashik, vnit nagpur, iit or any other equivalent institute) and approval from competent authority including working drawing required for construction use in 8 copies with soft copy having attractive cover and binding as directed by engineer in charge etc. complete (excluding vetting charges) preparation of detailed estimates of various component of project head works (earthen dam ,waste weir, h.r., spillway,energy dissipation arrangement (eda), outlets, diversion road. inspection road and structures on it, canal, rising main, lift componants and all c.d. works on it etc) including necessary follow up and obtaining approval from competent authority etc complete and submission of estimates in 3 copies along with soft copy and as directed by engineer-in-charg
Sector: Water Resource Department