Details: excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum includingdressing section to the required grade, camber and side slopes and conveying the excavatedmaterials with all lifts upto a lead of 50m. and spreading for embankment or stacking asdirected. dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000metres, stacking serviceable and unserviceable materials separately etc. complete. providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15cm to 20cm thick including hand packing and compacting etc. complete. construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to worksite, spreading in uniform layers with motor grader/ paver on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401--plant mix method and grading - iii material construction of dry lean cement concrete sub-
Sector: Harbor