Details: supplying trap /granite /quartzite / gneiss stone metal of required size by bringing the boulders at the road side breaking them to required gradation including conveying the boulders and stacking the broken metal etc. complete. (prior approval of sample stack of broken metal by the ex. engineer is necessary, the date of approval will form par b. by breaking boulder (hand broken)ii. 80 mm metal spec. no.rd. 19,20,21 / page no. 197 to 201 supplying trap /granite /quartzite / gneiss stone metal of required size by bringing the boulders at the road side breaking them to required gradation including conveying the boulders and stacking the broken metal etc, complete. (prior approval of sample stack of broken metal by the ex engineer is necessary, the date of approval will form par b. by breaking boulder (hand broken)ii. 40 mm metal. spec.no. rd. spec. no.rd. 19,20,21 / page no. 197 to 201 supplying murum having pi < 6 at the road side, including conveying and stacking complete. (pwd csr 20
Sector: RDPR