Details: item no.1: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. item no.2: excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. item no.2:supplying hard murum/ kankar at the road site, including conveying and stacking complete. item no.3: spreading hard murum/ soft murrum/ gravel or kankar for side width complete item no.4: compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete. item no.5: construction of granu
Sector: RDPR