Details: supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / rubble at the road side breaking them to required gradation including conveying the boulders/rubble and stacking the broken metal etc. complete . (prior approval of sample stack of broken metal by the ex. engineer is necessary the date of approval will form part of the measurements) a)40 mm metal, by breaking boulders (hand broken). supplying soft murum at the road site, including conveying and stacking complete. supplying hard murum/ kankar at the road site, including conveying and stacking complete. spreading 80/40 mm metal for road work including sectionong etc complete as directed by engineer in charge . spreading hard murum/ soft murrum/ gravel or kankar for side width complete compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with power roller having weight 8 to 10 mt. including nec
Sector: RDPR