Details: sub work no. 1 - desilting of lake ( wet and dry ) item 1 dewatering by pumping out water collected with diesel or electrical pumps including cost of all materials, machinery, labour, providing sump an all other ancillary operations whenever necessary etc. complete under specific and indispensable circumstances with prior approval from competent authority with authentic evidence of records justifying dewatering etc. complete as directed. item 2 removing wet silt from canal bed with 15 mtr.lead and all lift including depositing the excavated stuff etc. complete as directed. item 3 conveying materials obtained from road cutting including all lifts, laying in layers of 20 cm. to 30 cm. breaking cluods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard proctor density for a lead of 300 m. to 500m. inclusive, from the site of excavation to the site of deposition as directed. sub work no. 2 - cleaning and removing of aqu
Sector: RDPR