Details: dewat plant for gray water management-inlet chember section d iitem no1- excavtion for foundation in earth, soil of all type, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5 m.) by mechanical means. (dsr pwd 2022-23p. no. 153 sr.no. 21.02) item no2- excavation for foundation in hard murum and boulders including removing the excavated material up to adistance of 50metres, beyond the building area and stacking and spreading as directed,dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete.(liftfrom1.5mto 3.0 m.) by mechanical means (dsr pwd 2022-23p. no. 154 sr.no. 21.08) item no 3- pcc providing and laying castinsitu/ ready mix cement
Sector: RDPR