Details: excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. providing and laying in situ cement concrete m -20 with tremix treatment for 200 mm thickness forconcrete road is including laying plastic sheet for 125 micron thickness with groove cutting of 4 mm wide and 20mm deep with necessary refilling with bitumen ( excluding reinforcement) with coarse and fine aggregate ( naturalsand /vsi grade finely washed crushed sand) etc. complete -- m30 item converted to m20 item. difference in costof cement 0.40 mt - 0.35 mt = 0.05 mt at rs 6000 is 0.05 x 6000 = rs 300, hence final rate = basic rate for m30item - rs 3000 - rs 126 for non scada i.e. (8446 - 300 - 126 = 8020 final rate = 8020.00 providing and fixing board displaying information, such as 'name of work, tender cost,na
Sector: RDPR