Details: excavation for foundation in earth,soil of all types, sand,graval and soft murum, including removing the excavated material up to a distance of 50 m. beyound the building area & stacking & spreding as directed, dewatering,preparing the bed for the foundation and necessary back filling,remming,watering including shoring and strutting etc.coplete(lift up to 1.5 m.) dsr pn/in7/1 spec. no. bd a1 pn 259 a) toilet block (male /female) excavation for foundation in hard murum, including removing the excavated material up to a distance of 50 m. beyound the building area & stacking & spreding as directed, dewatering,preparing the bed for the foundation and necessary back filling,remming,watering including shoring and strutting etc.coplete(lift up to 1.5 m.) dsr pn/in7/3 spec. no. bd a2 pn 259 a) toilet block (male /female) providing and laying cast in situ/ready mix cement concrete inm-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding includi
Sector: RDPR