Details: item no.1:-providing and constructing 75 mm. thick modified penetraction macadam (mpm) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layers metal 30% crusher broken metal + 70% hand broken metal (by breaking rubble obtained by blasting) , heating and spraying the bitumen of specified grade @ 2 kg / sqm , spreading 12mm.size chips compacting with three wheel static roller having weight 8 to 10 mt. to achive the desired degree of compaction as per technical specification clause 506 etc.complete, including applying tack coat of specified grade of bitumen at the rate of 0.30 kg sqm. on existing bitumen surface. (vg-30 bulk bitumen rates are considered to arrive at rates) item no.2:-providing and applying tack coat on the prepared surface heating by fames in boiler and spraying bitumen set footed in bitumen boller on b.t. surface 2.5 kg/10 sqm.(vg-30 bulk bitumen rates are considered to arrive at rates) item no.3-open graded premix sur
Sector: RDPR