Details: removing grass, gazer grass and disposing off out of building premises including making clean the ground by shovel and phavaras etc. complete. excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5 m.) by mechanical means excavation for foundation in hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift from 1.5 m to 3.0 m.) by mechanical means providing and laying cast in situ/ready mix cement concrete in m-10 of trap/ gr
Sector: Forest and Environment