Details: excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5 m.) by mechanical means providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with crushed sand/grit, ramming, watering etc. complete. providing and laying cast in situ/ready mix cement concrete in m-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based plc with scada enabled reversible drum type mixer/concrete batch mix plant (pan mixer) etc. complete
Sector: RDPR