Details: part – a (work portion) item no.1:- labour charges for removing grass, thorny shrubs, jungli shurb, kubabul and alike grass along and in the drain/canal making the ground clean by showel and phavaras etc. complete as directed by engineer - in - charge. item no.2:- removing wet silt from canal bed with 15.00 m lead and all lifts including depositing the excavated stuff etc. complete as directed by engineer - in - charge. item no. 3:- excavation in all kinds of soil including boulders upto 0.6 m diameter (0.113 ) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead upto 1 km and all lifts as directed. item no.4 a :- providing and constructing 300 mm thick dry rubble stone pitching with pin headers at 2 per sqm using stones and s
Sector: Irrigation