Details: preparation of feasibility report-1.0-as per bid document and as directed by the engineer in charge:as per sbd ;preparation of preliminary design line estimate and drawings for tunnel etc., complete as directed by engineer-in-charge.-1.0-as per bid document and as directed by the engineer in charge:as per sbd ;preparation of preliminary design, estimate and drawings for intake forebay and jack well pump house and pumping machinery, pump house electrical works, electrical substation and terminal bay, sources of power supply, power line an dother electrical substation works, raising main and delivery chamber for all the alternatives and preparation of comparitive statement etc., complte as directed by engineer-in-charge.-1.0-as per bid document and as directed by the engineer in charge:as per sbd ;detailed study of kemphole and kumaradhara river and its tributaries (netravathi basin) to assess the impact on power generation, downstream power projects and other schemes which are depende
Sector: Irrigation