Details: clearing and grubbing land including uprooting rank vegetable grass, bushes, shrubs, saplings and trees upto 300mm girth by manual means, in areas of light jungle, removal of stumps, disposal of unserviceable materials, stacking of serviceable materials from road boundary etc. including cost of labour charges, all lead and lifts, etc. complete as directed by the engineer in charge;numbering and removing ceiling slab stone members of all sizes in existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones within the monument premises including cost and conveyance of all materials, labour charges etc, complete as per the directions of the engineer incharge of the work.;numbering and removing beam stones members of all sizes in existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones within the
Sector: Museums