Details: building structure foundation & super earth work excavation in foundation trenches for desired level(minimum 2.5 m) shall be as per structural drawing. however, careshall be taken to ensure to support the footings on firm strata as perminimum sbc specified in structural drawings. any deviation inearth work will be ignored and nothing extra shall be paid. fillingavailable excavated earth shall be used in sides of foundation &under floor, iffound suitable, otherwise filling to be done by bringing earth suitablefor filling from outside and disposal of surplus unusable earth /malba out of the campus, if required, and nothing extra shall be paidtowards the same.top soil of thickness 30 to 40 cm will be preserved for horticulturepurpose with in the campus at the designated place and filling thesame wherever required and nothing extra shall be paid towards thesame.structure
Sector: Science University