Details: road beautification. clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removalof stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness complete as per specifications . ii. by mechanical means:a. in area of light jungle. morth specification no. 201 ha 5.1119637.56100347.93218.49ksrrb m200-26. dismantling kerb stone by manual means and disposal of dismantled materials with all lifts and complete as per specifications. morth specification no. 202 m 880012.72111936337.57removing and resetting of kerb stones m 5900104.94619146437.51dismantling cement concrete flooring or plain cement concrete work including removing and conveying the debris to distance upto 200m (within average thickness of 15 cms). including cost of materials, labour, hom complete as p
Sector: Road development