| Tender Title |
Providing and supplying smart kitchen, dining utensils, furniture, digital library, solar water heaters and other facilities to the Scheduled Tribes (Technical) Student Hostel behind Mayura Hotel in Bellary City Ballari District under 2515 KKRDB (Macro Projects) for the year 2024-25. |
| Tender Description |
medium point above 3mtr upto 6mtr from tapping point to out let via switch. common sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, hom all machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of engineer-in-charge for finished item of work.;wiring for lighting/power circuit using one of frls pvc insulated 1100v grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified is 694:2010.1.5 mm2 common sr 2023-24 vol-6 pg no 5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, hom all machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of |
| Comments |
medium point above 3mtr upto 6mtr from tapping point to out let via switch. common sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, hom all machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of engineer-in-charge for finished item of work.;wiring for lighting/power circuit using one of frls pvc insulated 1100v grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified is 694:2010.1.5 mm2 common sr 2023-24 vol-6 pg no 5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, hom all machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of |