Post Monsoon Maintenance Dredging at New 127539267

The New Mangalore Port Trust has published a tender for "Post Monsoon Maintenance Dredging at New Mangalore Port for the year 2025-26- (Balance works at the risk and cost of M/s DCIL) - Re tender" on the 16 Sep 2025. This tender belongs to Dredging service category. This tender is published in Dakshina Kannada, Karnataka location. The vendors interested in this tender and related Dredging service tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: all civil works Tenders | dredging Tenders | dredgers Tenders
Related categories: Canal construction service Tenders | Main Canal Construction Tenders | Distributary Canal Construction Tenders |

Did You Know?

Around 17811 tenders were floated in Karnataka in the past month with major spending on pipe laying Tenders, road relaying Tenders, afforestation services Tenders

Tender Details
 Tender Title / Description
Tender Title Post Monsoon Maintenance Dredging at New Mangalore Port for the year 2025-26- (Balance works at the risk and cost of M/s DCIL) - Re tender
Tender Description part -i maintenance dredging on in-situ basis by deploying the trailer suction hopper dredger in the areas of outer approach channel, lagoon (drawing of the dredging area enclosed), including oil dock arm, turning circle and in front of k.i.o. berth (extension lagoon). the areas required to be dredged from the existing levels to their minimum designed depths of (-) 8.00 mcd at b.no. 1, and in front of b.no.1 up to centre line of o.a.c, (-)12.00 mcd at b.no. 2, ( -) 11.00 mcd at b.nos.3, (-) 10.50 mcd at b. no. 4 to 7 in the oda, & 14 (e), (-) 14.00 mcd at b. no.8 & 12 (-)12.50 mcd at be rth no.9, (-)15.10 mcd at berth nos.14 (w),15,16,10, 11, & 13.the outer approach channel is of total length 7500 mts. (towards sea which depends upon the shifting of the (-) 15.40 m contour due to siltation).maintenance dredging of all these areas involves dredging in all types of soil comprising of fine silt, sand, clay etc. the dredged material is to be taken away by the dredging contractor for reus
Comments part -i maintenance dredging on in-situ basis by deploying the trailer suction hopper dredger in the areas of outer approach channel, lagoon (drawing of the dredging area enclosed), including oil dock arm, turning circle and in front of k.i.o. berth (extension lagoon). the areas required to be dredged from the existing levels to their minimum designed depths of (-) 8.00 mcd at b.no. 1, and in front of b.no.1 up to centre line of o.a.c, (-)12.00 mcd at b.no. 2, ( -) 11.00 mcd at b.nos.3, (-) 10.50 mcd at b. no. 4 to 7 in the oda, & 14 (e), (-) 14.00 mcd at b. no.8 & 12 (-)12.50 mcd at be rth no.9, (-)15.10 mcd at berth nos.14 (w),15,16,10, 11, & 13.the outer approach channel is of total length 7500 mts. (towards sea which depends upon the shifting of the (-) 15.40 m contour due to siltation).maintenance dredging of all these areas involves dredging in all types of soil comprising of fine silt, sand, clay etc. the dredged material is to be taken away by the dredging contractor for reus
 Important Dates
Published Date
Due Date 07 Oct 2025 00:00:00
 Estimate and EMD
Estimated Value 83.29 Crore
EMD 0 INR
Processing Fee 0 INR
 Tender No

TSID: 127539267

 Tender Type and Location
Tender Category
Tender Type
WhatsApp Chat