Details: scrapping and removing top soil :-scrapping the area by removing 0.15m soil and removing of unwanted plants, grass along with roots.25km initial transport, including lead, lift loading and unloading charges. (1x1x0.15mt) (forest/horticulture/watershed department/common sanctioned schedule of rates for the year 2022-23 item no.12.10 (a) page 49);1st digging:-digging of the area for developing lawn including removing weeds, debris if any and breaking of clumps, watering etc. (1x1x0.45mt) (forest/horticulture/watershed department/common sanctioned schedule of rates for the year 2022-23 item no.12.11 (b) page 49);supply of inputs such as sand, fym, red earth in 1:3:6 ratio.mixing and spreadingthe mixture to 7.50cm thickness wherever required * red soil 0.0075m3 * farm yard manure 0.0225m3 * sand 0.045m3. (forest/horticulture/watershed department/common sanctioned schedule of rates for the year 2022-23 item no.12.11 (e) page 49);procurement of quality red earth/soil and heap around pit (1x1
Sector: Museums