Details: reconnaissance survey of road alignment in hilly road utilising exsisting forest cart tracks with use of ghat tracer (if found necessary), taking three dimensions of apexes including verification of type of land etc. (without chaining) complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of work;carrying of detailed topographic survey by using total station along the existing or new road including taking l-section and cross section at every 30 meter row, taking at least 10 spot levels per cross section, picking up all existing details inside the row like electric telephone line, encroachments, structures etc. connecting all the primary total station control points by g.i.s. bench marks level or whichever available with department using auto level and preparing auto cad plan by using above data taking out 1 set of black and white printout on 50 micron polyster film sheet a2 size and 2 sets of coloured printout on a2 si
Sector: Irrigation