Details: de-silting of feeder channel/canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of embankment or as directed including cost of all machinery, labour & all necessary works as directed and complete as per specification. as per csr 2023-24 vol 4 part ii(mi&gwdd):3.13, page no.140;earth work excavation for foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. in all kinds of soils depth upto 3 m (as per csr 2023-24 vol 1:1.14.1 page no.38;providing and installation of class sn8 double wall corrugated hdpe pipe outer wall cor
Sector: Agriculture Dept