Details: dewatering on bhp basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 5.0 to 9.0 bhp pump etc. complete. (prior approval of superintending engineer will be necessary) with all lead and lift as directed by engineer-in charge-of work.;clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) by mechanical means using dozer (b )in area of thorny jungle with all lead and lift as directed by engineer-in charge-of work.;dismantling of existing structures like culverts, bridges, retaining walls and other
Sector: Urban Authority