Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness including all labour, hire charges of all machineries etc., complete.in area of light jungle-by mechanical means using dozer and as directed by engineer in charge of the work. scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres including all labour, usage charges of all machinery etc., complete, by mechanical means using hydraulic excavator and as directed by engineer in charge of the work. excavation in soil with dozer with lead upto 1000 meters: earthwork excavation for road way in soil by mechanical means using doze
Sector: Road development