Details: providing and laying ductile iron pipes of class k9 conforming to is 8329:2000 with latest amendments, conveyiing to work site, rolling and lowering into trenches, laying true to line, level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations, cutting of pipes wherever necessary, jointing with di specials (excluding cost of specials) and rubber gaskets, cleaning the socket and spigot end with soap solution, applying soft soap to the socket and spigot ends before insertion of rubber gaskets, jacking and fixing in perfect conditions etc. the cost to include soap solution, soft soap, waste etc. and giving necessary hydraulic test to the required pressure as per iss with all lead and lifts and cost of all jointing materials. (the contractor will make his own arrangements for water for testing. earth work excavation in trenches to be measured and paid for seperately) note: in sewerage projects for internal cement mortal lining ( cml
Sector: Water supply and Sewerage