Details: dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 in volume and stock piling at designated locations and disposal of dismantled materials and stacking serviceable and unserviceable materials separately complete all lead and lifts as per engineer incharge;earth work excavation for foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. in all kinds of soils depth upto 3 m complete all lead and lifts as per engineer incharge;earth work in surface excavation by mechanical means for lowering & leveling the ground for
Sector: Irrigation