The RCCTVM has published a tender for "Balance works for upgradation of higherside HVAC system at Regional Cancer Centre" on the 19 Jul 2024. This tender belongs to Hospital construction service category. This tender is published in Thiruvananthapuram, Kerala location. The vendors interested in this tender and related Hospital construction service tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: non residential buildings Tenders | all civil works Tenders | non residential buildings construction Tenders
Related categories: Bank Building Construction Tenders | Fire Station Construction Tenders | Modular OT Equipments Tenders |
Kerala has published 5,753 tenders in Hospital construction service in the last financial year.
Out of these, 151 were published last month.
Tender Title | Balance works for upgradation of higherside HVAC system at Regional Cancer Centre |
---|---|
Tender Description | part -a sitc of cooling towers -cti/jci approved supply, installation, testing & commsssioning the cooling towers as per specification including all accessories as specified and as required250 tr cooling towers of actual capacity complete in all respects as per technical specifications and equipment schedule complete with frp casing, frp fan cylinder, pvc louvers, pvc drift eliminator polypropylene nozzles, drive assembly, hdg fan guard/bird screen, non-clogging nozzle type water distribution system. pvc fill, aluminium ladder with railings, make up, quick fill, drain over flow connections, provision for equilizer line etc. as per specifications. including r.c.c foundation along with pcc/rcc sub base with bolts and nuts and finishing the slabs or any opening etc.ewt = 97.5 degree flwt = 90 degree fwet bulb = 82 degree fflow rate = 1000 usgpm 250 tr - cti approvedinduced draft, cross flow cooling tower with vertical air dischargemotor suggested 10 hp chilled water piping (pre insula |
Comments | part -a sitc of cooling towers -cti/jci approved supply, installation, testing & commsssioning the cooling towers as per specification including all accessories as specified and as required250 tr cooling towers of actual capacity complete in all respects as per technical specifications and equipment schedule complete with frp casing, frp fan cylinder, pvc louvers, pvc drift eliminator polypropylene nozzles, drive assembly, hdg fan guard/bird screen, non-clogging nozzle type water distribution system. pvc fill, aluminium ladder with railings, make up, quick fill, drain over flow connections, provision for equilizer line etc. as per specifications. including r.c.c foundation along with pcc/rcc sub base with bolts and nuts and finishing the slabs or any opening etc.ewt = 97.5 degree flwt = 90 degree fwet bulb = 82 degree fflow rate = 1000 usgpm 250 tr - cti approvedinduced draft, cross flow cooling tower with vertical air dischargemotor suggested 10 hp chilled water piping (pre insula |
Published Date | |
---|---|
Due Date | 13 Aug 2024 00:00:00 |
Estimated Value | 41.22 Lakh |
---|---|
EMD | 0 INR |
Processing Fee | 0 INR |