Description: Renovation of room 507 and 509 in NCESS Name of Work Renovation of room 507 and 509 dated 8 3 23
Details: Room 507 and 509 Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two or more coats applied on walls @ 1.25 ltr/10 sqm sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm (13.48.1) Melamine polishing on woodwork (one or more coat) 13.114 Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture 13.48.3 Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be
Sector: Research center