Details: appendix-a-preparing architectural drawing 56.12.a:total station surveying and preparation of site plan - plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval. od7261/2024-2025:preparation of architectural drawing (1 % of the total project cost). note: i) quantity should be amount in hundreds, ie. for rs. 100000.00, quantity shall be 1000. ii) percentage deduction in case of negotiation shall be included in decimal format within the coefficient cell.(based on 56.19.3) od8328/2024-2025:2 minutes of architectural 3d visualization for harbour in video format and 10 high quality render images
Sector: Harbor