Details: demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in-charge. nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) extra for cutting reinforcement bars manually/ by mechanical means in r.c.c. or r.b. work ( payment shall be made on the cross sectional area of r.c.c. or r.b work) as per direction of engineer-in-charge. dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. for thickness of tiles 10 mm to 25 mmlabour engaged for petty repairs of pipe line etc completealuminium work for fixed portion- powder coated aluminium (minimum thickness of powder coating 50 micron)11.41.2 providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to is : 15622, of approved make, in all colours and shades, laid on 20 mm thick c
Sector: Management Education