Details: earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders ss.20b and sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 first depth plinth beam supplying and filling in foundation and basement with well gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. plain cement concrete 1:4:8 (one part of cement, four part of crushed stone sand (m- sand) and eight part of coarse aggregates) using 40mm size iss hbg metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such a
Sector: Municipality