The TNEB Limited has published a tender for "OT 199" on the 06 Mar 2024. This tender belongs to Bottom Ash Hopper Repair category. This tender is published in Chennai, Tamil Nadu location. The vendors interested in this tender and related Bottom Ash Hopper Repair tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: ash handling system Tenders | gas distribution Tenders | chute installation Tenders
Related categories: Pitch stopper Tenders | Vibration Mounting System Tenders | Dust deflector Tenders |
In Chennai district, Tamil Nadu, a total of 2 Bottom Ash Hopper Repair tenders have been published, with
Tender Title | OT 199 |
---|---|
Tender Description | overhauling of 2 ton hoist. (this work involves brought down from 45 mtr to 0mtr level for dismantling of drum, drum top cover, motor , gear box cover, pulleys, brake shoes, steel rope, rope guide vane, shaft and guide vane. reconditioning the rope guide, refitting the above parts and assemble the same at 45 mtr elevation). overhauling of 3 (or) 5 ton hoist. (this work involves brought down from 25mtr to 0mtr level for dismantling of drum, drum top cover, motor , gear box cover, pulleys, brake shoes, steel rope, rope guide vane, shaft and guide vane. reconditioning the rope guide, refitting the above parts and assemble the same at 25mtr elevation). overhauling of secondary crusher 10 ton hoist. (this work involves brought down of hoist from 14 mtr to 0mtr level for dismantling of drum, drum top cover, motor , gear box cover, pulleys, brake shoes, steel rope, rope guide vane, shaft and guide vane. reconditioning the rope guide, refitting the above parts and assemble the same at 14 m |
Comments | overhauling of 2 ton hoist. (this work involves brought down from 45 mtr to 0mtr level for dismantling of drum, drum top cover, motor , gear box cover, pulleys, brake shoes, steel rope, rope guide vane, shaft and guide vane. reconditioning the rope guide, refitting the above parts and assemble the same at 45 mtr elevation). overhauling of 3 (or) 5 ton hoist. (this work involves brought down from 25mtr to 0mtr level for dismantling of drum, drum top cover, motor , gear box cover, pulleys, brake shoes, steel rope, rope guide vane, shaft and guide vane. reconditioning the rope guide, refitting the above parts and assemble the same at 25mtr elevation). overhauling of secondary crusher 10 ton hoist. (this work involves brought down of hoist from 14 mtr to 0mtr level for dismantling of drum, drum top cover, motor , gear box cover, pulleys, brake shoes, steel rope, rope guide vane, shaft and guide vane. reconditioning the rope guide, refitting the above parts and assemble the same at 14 m |
Published Date | |
---|---|
Due Date | 21 Mar 2024 00:00:00 |
Estimated Value | 0.0 |
---|---|
EMD | 0 INR |
Processing Fee | 0 INR |