Details: excavation in foundation for retaining, walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications clause 305.1 of mord specifiction concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and t&p etc. required for proper completion of the work. as per drawings and technical specifications clause 802, 803, 1202 & 1203 brick work with common burnt clay modular bricks of class designation7.5 in foundation and plinth in:cement mortar 1:6 (1 cement : 6 coarse sand) 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) distempering with oil bound washable distemper of approved brand and manufacture to give an even shade : new work (two or more coats) over and including water thinnable priming coat with cement primer steel work in built up tubular (round, square or
Sector: Municipality