Details: site clearance including all labour and t&p. 1-2 excavation in foundation for retaining, walls etc, in all types of soils and rocksincluding all lead, lift and disposal of surplus material as per direction of engineer - in- charge, as per drawing and technical specifications clause 305.1 of mordspecifiction 2-2 concrete with cement, coarse sand and 40 mm gauge stone ballast inproportion 1:4:8 in foundations and floors including supply of all material,labour and t&p etc. required for proper completion of the work. as perdrawings and technical specifications clause 802, 803, 1202 & 1203 13-1 providing and laying reinforced cement concrete in superstructure as per drawing andtechnical specifications clauses 800, 1205.4 and 1205.5 13-1-1-1-b height 5m to 10 m 13-4 supplying, fitting, and placing ms bar reinforcement in superstructure complete asper drawing and technical specifications clauses 1002, 1010 and 1202 rate 67859.10/1000=67.86kg 5.9 centering and shuttering including struttin
Sector: Municipality