Details: with itc availability earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil. providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - all work up to plinth 1:3:6 (1 cement : 3 coarse sand (zone-ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. painting with synthetic enamel paint of approved brand and manufacture to give an even shade : two or more
Sector: Mining