Details: excavation of foundation in hard soil witin 50m initial lead 1.5 m initial lift including rough dressing & levelling as per the direction of engr in charge filling foundation and plinth with sand well watered and rammed including cost and conveyance of materials. c.c.(1:4:8) with 20 mm. size h.g. chips in f&p. brick work with fly ash brick (23x11x8)cm having crushing strength not less than 75kg/cm2 with dimensional tolerance +- 8% in cm (1:6) in f&p cement concrete (1:2:4) with 12 mm size hard granite chips (per ) supplying of gi pipe complete as per technical specification in cluding ms iron flat pieces and nuts & bolts. (a) 50 mm dia pipe (b) 40 mm dia pipe (b) ms © nuts bolts washers iron work wrought and put up in trusses and record racks(labour only) including cost of all labour, t&p etc. as per direction of enigineer in-charge hoisting joist & truses and placing in position 12mm thick cement plaster in cm (1:6) over brickwork outside in ground floor
Sector: Agri Marketing