Details: dismanteling & removing cement concrete including stacking the useful materials for reuse and removing the debris with in 50. m lead. (per 1 .) layer not exceeding 0.3m in depth and as per specification approved by the department etc. complete.etc. complete as per direction of engg-in-charge . excavation of foundation in hard soil witin 50m initial lead 1.5 m initial lift including rough dressing & levelling as per the direction of engr in charge filling foundation and plinth with sand well watered and rammed including cost and conveyance of materials. c.c.(1:4:8) with 20 mm. size h.g. chips in f&p. cement concrete (1:2:4) with 12 mm size hard granite chips (per ) supplying of gi pipe complete as per technical specification in cluding ms iron flat pieces and nuts & bolts. (a) 50 mm dia pipe (b) 40 mm dia pipe (b) ms © nuts bolts washers iron work wrought and put up in trusses an
Sector: Agri Marketing