Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. by mechanical means using dozer rcdsor 2.03 (ii) a cutting of trees, removal of stumps and roots of trees cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres. girth from 300mm to 600mm. rcdsor 2.01 (a+b) cutting of trees, removal of stumps and roots of trees cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres. girth from 600mm to 900mm. rcdsor 2.01 (a+b) cutting of trees, removal of stumps and roots of trees cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres. girth from 9
Sector: Road development