Details: demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of engineer-incharge 1:3:6 or richer mix (i/c equivalent design mix) providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) providing and fixing in position pre-moulded joint filler in expansion joints. centering and shuttering including strutting, propping etc. and removal of form work for retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and
Sector: Power Sector