The Eastern Coalfields Limited has published a tender for "Installation and commissioning of conveyor belts in RVIIC seam, Depillaring and Development Panel No. P2, P3, P4, P5, P6, P9(A)of CM project at Nakrakonda- Kumardihi B Colliery under Bankola area" on the 30 Mar 2026. This tender belongs to Colliery Improvement Services category. This tender is published in Barddhaman, West Bengal location. The vendors interested in this tender and related Colliery Improvement Services tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: all civil works Tenders | blasting services Tenders | chute installation Tenders
Related categories: Colliery Improvement Services Tenders | Colliery Tenders |
ECL issued 1,042 tenders for Colliery Improvement Services last year
With, 50 floated just last month.
| Tender Title | Installation and commissioning of conveyor belts in RVIIC seam, Depillaring and Development Panel No. P2, P3, P4, P5, P6, P9(A)of CM project at Nakrakonda- Kumardihi B Colliery under Bankola area |
|---|---|
| Tender Description | item discription installation and commissioning of 1000mm wide x 468 mtr conveyor belt in panel no. p-2, rviic seam, -5d/-20l to -23d/-20l of cm project at nakrakonda kumardihi b colliery under bankola area transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5mt+discharge unit- 2.5mt+tail end -1mt+load table-1mt+loop take up with tension trolley drum-3.60mt+fix unit-1mt+motor, winch starter & switches cables etc -2.0mt+1000mm wide conveyor structure with top, bottom roller & stool-468mtr @68kg/mtr=31.8mt+ 10 times tail end shifting (shortning)- 10mt. total weight =63.4 mt (1000mm wide dual drive conveyor belt of depillaring panel no. p-2 rviic seam of -5d/-20l to -23d/-20l, length: - 468mtr.) fitting of tail end and discharge scraper. belt laying including transporting of belt, jointing, tensioning, trail run etc foundation, bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos cleaning of coal & unused ma |
| Comments | item discription installation and commissioning of 1000mm wide x 468 mtr conveyor belt in panel no. p-2, rviic seam, -5d/-20l to -23d/-20l of cm project at nakrakonda kumardihi b colliery under bankola area transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5mt+discharge unit- 2.5mt+tail end -1mt+load table-1mt+loop take up with tension trolley drum-3.60mt+fix unit-1mt+motor, winch starter & switches cables etc -2.0mt+1000mm wide conveyor structure with top, bottom roller & stool-468mtr @68kg/mtr=31.8mt+ 10 times tail end shifting (shortning)- 10mt. total weight =63.4 mt (1000mm wide dual drive conveyor belt of depillaring panel no. p-2 rviic seam of -5d/-20l to -23d/-20l, length: - 468mtr.) fitting of tail end and discharge scraper. belt laying including transporting of belt, jointing, tensioning, trail run etc foundation, bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos cleaning of coal & unused ma |
| Published Date | |
|---|---|
| Due Date | 15 Apr 2026 00:00:00 |
| Estimated Value | 2.18 Crore |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |