The WBSMB has published a tender for "WBSAMB/eT/ CEO /28 /2025-26" on the 13 Mar 2026. This tender belongs to Road Construction category. This tender is published in Nadia, West Bengal location. The vendors interested in this tender and related Road Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: road Tenders | road and drain Tenders | all civil works Tenders
Related categories: Road Construction Tenders | Bus Bay Tenders | Road related beautification Tenders |
West Bengal has published 7,793 tenders in Road Construction in the last financial year.
Out of these, 855 were published last month.
| Tender Title | WBSAMB/eT/ CEO /28 /2025-26 |
|---|---|
| Tender Description | compacting original ground supporting embankment loosening, leveling and compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at omc and then compacted by rolling so as to achieve minimum dry density as given in tables 300.1 and 300.2 for embankment construction as per clause 305.3.4 of specifications for road & bridge works of mort&h (5th revision). construction of sub base using local materials, spreading in uniform layers with motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per clause 401 of specifications for road & bridge works of mort&h (5th revision(i) for |
| Comments | compacting original ground supporting embankment loosening, leveling and compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at omc and then compacted by rolling so as to achieve minimum dry density as given in tables 300.1 and 300.2 for embankment construction as per clause 305.3.4 of specifications for road & bridge works of mort&h (5th revision). construction of sub base using local materials, spreading in uniform layers with motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per clause 401 of specifications for road & bridge works of mort&h (5th revision(i) for |
| Published Date | |
|---|---|
| Due Date | 27 Mar 2026 00:00:00 |
| Estimated Value | 6.17 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |