Description: Construction and new fabrication with assembly of 90 KW drive head unit and drive base frame material carrying and transporting at different place og UG site to surface at Shyamsundarpur Colliery under Bankola Area Name of Work Stabilization of head gear structure of pit no 2 by renovating modification strengthening of head gear structure with all girders and joint rusted plate riveting change etc at pit no 2 of Shyamsundarpur Colliery
Details: Item Description/ Heading Making of temporary arrangement (fixed and flexible platform) for support and platform on headgear and cutting/dismantling of rusted/riveting damaged portion of the subjected. Complete cleaning of rusted portions and accumulated rope compound from up and bottom supporting girders and guest plate at Mine pit B) Dismantling/opening of old and used (damaged) steel structure for post, stay, palling and other etc. riveting change at pit no 2 Overhauling, Opening/re -fitting and setting of headgear pulley plumber block bushing (both side) for headgear top portion. Making /strengthening and riveting of Headgear structure, supporting girders, gusted plate and platform etc. at pit no.2. Complete alignment checking and trail run for winding rope and cage etc. Air Compressor for riveting job. Oxygen Gas (Rent and transporting) D. A. Gas (Rent and transporting) Welding electrodes Bolt and Nut with washer- (different size) Rivet Total impact of GST for the purpose of CTC
Sector: Mining