Details: labour for taking out brick- on -end edging including removing debries to flank or berm, sorting out serviceable materials & stacking labour for taking out old brick-on-edge edging including removing debris to flank or berm sorting out serviceable materials and stacking. labour for taking out brick-on-edge of herring bond including removing debris to flank or berm sorting out serviceable materials and stacking. labour for taking out old soling including removing debries a) single flat soling b) double flat soling box cutting in road embankment in all kinds of soil and spreading the soil uniformely over the flanks and considerating and dressing the subgrade to correct camber and grade. labour for breaking 1/2 brick or full bricks (old or new) into metal/ khoa/ cjip as per specifiv size and stacking the same at site or stackyard with due allowance on sinkage/shrinkage as per direction of the engineering in charge.(b) khoa size 32mm to 25mm construction of sub base on prepared surface
Sector: Social Development