Details: pond renovation 50.2.3.1:pumping or bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete 2.31:clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil od150460/2024-2025:dismantling dr - dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in dr masonry including disposal of debris within a distance of 150m. od150469/2024-2025:dr with departmental stone-dry rubble masonry w
Sector: RDPR