Details: investigation work 2.3.2.b:clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> in area of thorny jungle - by mechanical means<br> od37721/2024-2025:mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - for machine boring od37728/2024-2025:setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - for machine boring. (modified dar 56.2.a) od37753/2024-2025:providing access to the site,clea
Sector: PWD